Chinese translation for "instrument approach"
|
- 靠仪表接近
仪表进场着陆 仪器进场 仪器着陆
Related Translations:
- Example Sentences:
| 1. | Cleared for standard instrument approach 允许标准仪表进近。 | | 2. | Instrument approach chart 计器进入方式 | | 3. | In order to make the terminal airspace moderated and consisted , and acquire the biggest capacity of airport , we must consider the influencing factors as many as possible , it is our final target to plan the airspace in beijing terminal unify . with the conditions that the current operation modes of parallel runway , approach and departure procedures and terminal airspace in beijing international airport , this article has analyzed the reasons of airspace congestion . this article also applies the theory of instrument flight procedure and utilizes the current facilities in beijing international airport . the design of flight procedures combining rnav procedures with instrument approach procedures may be accepted on some routes . it make the approach and departure procedure more effective , and increase the capacity of the airport more or less ; secondly , this article contrast the capacities of parallel runway in different methods under radar control , and make the conclusion that the parallel runway in dependent operation modes has the biggest capacity 本文从目前首都机场平行跑道的运行方式、进离场程序、终端区空域的现状入手,剖析了造成空域紧张的原因,应用仪表飞行程序设计的思想和原则,利用首都机场终端区现有的设施,某些航线可采用区域导航( rnav )程序与仪表进近程序相结合的飞行程序设计,优化了目前首都机场的进离场程序,在一定程度上增加了机场容量;其次,研究了雷达管制条件下平行跑道不同运行方式的容量对比,得出平行跑道独立运行的容量最大,然后以这种这种运行方式,为首都机场设计出了平行跑道独立运行的飞行程序;最后,分析北京终端区各机场空域对首都机场飞行程序安全、有效运行的制约因素,研究设计出了北京终端区规划方案及规划后的飞行程序和飞行方法,以达到增大机场的容量,适应未来航班量增加的需求。 | | 4. | The squall line complex continued to move southeast . at about 12 : 30utc 8 : 30 p . m . local time , an area of intense rain , over 100 mm h , moved to just south of ting kau tk , see figure 9 for location to cross the approach path of runway 25r northern runway at a time a plane was making an instrumented approach to runway 25r see figure 10 飑线群继续向东南方移动,在大约协调世界时12时30分本港时间下午8时30分,一个降雨率超过每小时100毫米的大雨区刚好移到汀九tk ,位置见图9南面,横过25r跑道北跑道的降落航道,而这时正有一架航机以仪表导航方式准备降落25r跑道图10 。 |
- Similar Words:
- "instrument and meter" Chinese translation, "instrument and meter engineering" Chinese translation, "instrument and meter for automation" Chinese translation, "instrument and meter plant" Chinese translation, "instrument and meters factory" Chinese translation, "instrument approach chart" Chinese translation, "instrument approach fix" Chinese translation, "instrument approach landing environment" Chinese translation, "instrument approach localizer" Chinese translation, "instrument approach procedure" Chinese translation
|
|
|